Share This Listing

Message

931 characters remaining

Hmm, there seems to have been an error sending your message. Please try again.

Your email has been sent.

Still interested?

Contact the brokers for more information about this property

Investment Highlights

  • A rare convergence of power, water, and scale enabling hyperscale AI deployment.
  • Gigawatt Scale Natural Gas Available in 2028-2029.
  • Up to 1.47 Billion gallons of water available per year.
  • Confirmed Lumen backbone fiber route adjacent to the site. Preliminary engineering indicates a practical lateral extension.

Executive Summary

GIGAWATT SCALE DATA CENTER & ENERGY CAMPUS
1,280 Acres | Light Industrial/Data Center.
526 Acres (+/- 278 acres usable) | Hard Industrial.
4,636 Acres | AMR (Solar Developable).
Topography | Level / Gentle Slope.
WATER RIGHTS
Up to 4,500 AFA - 1.47 Billion gallons per year of industrial water are available for development and power generation.
The 4,500 AFA of industrial water rights are permitted to optionally be pumped from one central well location that has already been installed, tested and developed.
Permits are approved and issued.
Renewable Power and Generation
Gigawatt Scale Natural Gas Available.
NV Energy 1 GW Engineering Study is Process.
Transmission Ramp Start Request Q4 2028.

Attachments

NNHCP V20

Data Room Click Here to Access

Property Facts

Sale Type Investment or Owner User
No. Lots 1
Property Type Land
Property Subtype Industrial
Proposed Use Power Center
Total Lot Size 6,436.00 AC
Zoning Multiple - 1,280 Acres | Light Industrial/Data Center. 526 Acres (+/- 278 acres usable) | Hard Industrial. 4,636 Acres | AMR (Solar Developable).

1 Lot Available

Lot

Lot Size 6,436.00 AC

GIGAWATT SCALE DATA CENTER & ENERGY CAMPUS 1,280 Acres | Light Industrial/Data Center. 526 Acres (+/- 278 acres usable) | Hard Industrial. 4,636 Acres | AMR (Solar Developable). Topography | Level / Gentle Slope.

Description

A rare convergence of power, water, and scale enabling hyperscale AI deployment. Up to 1.47 Billion gallons of water available per year. Dual 345kV transmission adjacency 2 GW study underway with NV Energy - results expected Q3 2026 Up to 1GW peak PV developable on premises. Multi-GW potential Gigawatt Scale Natural Gas Available in 2028-2029. An NV Energy 1 GW Engineering Study is in Process. Transmission Ramp Start Request Q4 2028. Up to 1 GW Peak PV Solar Developable On Premises. Additional 1-2 GW Adjacent Solar Available for Development

Exceptionally drivable
100/100
Somewhat bikeable
20/100
  • Listing ID: 37837792

  • Date on Market: 9/26/2025

  • Last Updated:

  • Address: 0 Frontage Road, Lovelock, NV 89419

Link copied
Your LoopNet account has been created!

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, "rating") }}
255 character limit ({{ remainingChars() }} charactercharacters remainingover)
{{ getErrorText(feedbackForm.msg, "rating") }}
{{ getErrorText(feedbackForm.fname, "first name") }}
{{ getErrorText(feedbackForm.lname, "last name") }}
{{ getErrorText(feedbackForm.phone, "phone number") }}
{{ getErrorText(feedbackForm.phonex, "phone extension") }}
{{ getErrorText(feedbackForm.email, "email address") }}