Your email has been sent.
18 MW Approved Renew Amston: Phase 2 0042 Old Amston Rd 40,000 SF of Industrial Space Available in Colchester, CT 06415



Highlights
- 10 MW approval by CT Siting Council (and all other authorities) to generate power on site (Expandable to 18MW)
- Seeking a data center owner to lease the ground for $1 and sign a PPA for predictable cost power from our 10 MW power pad, build your own data center
- Data center pad is a 40k sf footprint. Buildable to two floors for a total of 80k sf.
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Condition
- Available
• Colchester, CT, rural suburb of Hartford, located ½ way between NYC and Boston • 10 MW approval by CT Siting Council (and all other authorities) to generate power on site (Expandable to 18MW) • Natural Gas-fired Bloom Fuel Cells • Data center pad is a 40k sf footprint. Buildable to two floors for a total of 80k sf. • Rooftop solar • Fuel Cells ready to convert to RNG or H2 when distribution network is available • Options for battery storage, belly tank generator, or carbon capture • Waste Heat and stormwater capture • Will send excess power, heat, and water to an organic greenhouse on site • A portion of the produce will be donated to local foodbanks, schools, and other charities • Seeking a data center owner to lease the ground for $1 and sign a PPA for predictable cost power from our 10 MW power pad, build your own data center • Our power will cost less than grid power • The grid will not have capacity for several years, but could convert to grid power in the future
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor | 40,000 SF | Negotiable | $1.00 /SF/YR $0.08 /SF/MO $40,000 /YR $3,333 /MO | Industrial | - | TBD |
1st Floor
| Size |
| 40,000 SF |
| Term |
| Negotiable |
| Rental Rate |
| $1.00 /SF/YR $0.08 /SF/MO $40,000 /YR $3,333 /MO |
| Space Use |
| Industrial |
| Condition |
| - |
| Available |
| TBD |
1st Floor
| Size | 40,000 SF |
| Term | Negotiable |
| Rental Rate | $1.00 /SF/YR |
| Space Use | Industrial |
| Condition | - |
| Available | TBD |
• Colchester, CT, rural suburb of Hartford, located ½ way between NYC and Boston • 10 MW approval by CT Siting Council (and all other authorities) to generate power on site (Expandable to 18MW) • Natural Gas-fired Bloom Fuel Cells • Data center pad is a 40k sf footprint. Buildable to two floors for a total of 80k sf. • Rooftop solar • Fuel Cells ready to convert to RNG or H2 when distribution network is available • Options for battery storage, belly tank generator, or carbon capture • Waste Heat and stormwater capture • Will send excess power, heat, and water to an organic greenhouse on site • A portion of the produce will be donated to local foodbanks, schools, and other charities • Seeking a data center owner to lease the ground for $1 and sign a PPA for predictable cost power from our 10 MW power pad, build your own data center • Our power will cost less than grid power • The grid will not have capacity for several years, but could convert to grid power in the future
Property Overview
Colchester, CT, rural suburb of Hartford, located ½ way between NYC and Boston Two Phases, Phase 2 in Red Box 18 MW approval by CT Siting Council (and all other authorities) to generate power on site Natural Gas-fired Bloom Fuel Cells Created a JV with a PE firm to build, own, operate the power pad, which will sell power to the adjacent data center Data center pad is a 40k sf footprint. Buildable to two floors for a total of 80k sf. Total Capex for the power pad only : $85M+/- State of the Art HPC/AI Data Center Rooftop solar Fuel Cells ready to convert to RNG or H2 when distribution network is available Options for battery storage, belly tank generator, or carbon capture Waste Heat and stormwater capture Will send excess power, heat, and water to an organic greenhouse nearby A portion of the produce will be donated to local foodbanks, schools, and other charities Seeking a data center owner to lease the ground for $1 and sign a PPA for predictable cost power from our 10-18 MW power pad, build your own data center Our power will cost less than grid power The grid will not have capacity for several years, but could convert to grid power in the future
Data Center Facility Facts
Presented by
ReNew Developers LLC
18 MW Approved Renew Amston: Phase 2 | 0042 Old Amston Rd
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
