Log In/Sign Up
Your email has been sent.
Highlights
- 222,219 SF Available Immediately (Divisions available greater then 52,000 SF)
- 3.6 miles from the Long Island Expressway/Interstate 495, and 4.2 miles from the Northern State Parkway
- Impressive Walk To Work Labor Pool Within A 5 Mile Radius Of The Site
- New Ownership recent site and building improvements completed.
- Freight Rail Transload Facility in close proximity.
Features
Clear Height
40’
Column Spacing
44’ x 50’
Drive In Bays
4
Exterior Dock Doors
24
Levelers
16
Standard Parking Spaces
316
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Build-Out
- Available
Available immediately! Capital improvements completed. https://www.145candlewoodroad.com/
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- ± 222,219 SF Available (Will divide)
- 1 Drive Bay
- 16 Loading Docks
- Division options greater than 50,000 SF available
| Space | Size | Term | Rental Rate | Space Use | Build-Out | Available |
| 1st Floor | 52,440-222,219 SF | Negotiable | $16.25 /SF/YR $1.35 /SF/MO $3,611,059 /YR $300,922 /MO | Industrial | Spec Suite | Now |
1st Floor
| Size |
| 52,440-222,219 SF |
| Term |
| Negotiable |
| Rental Rate |
| $16.25 /SF/YR $1.35 /SF/MO $3,611,059 /YR $300,922 /MO |
| Space Use |
| Industrial |
| Build-Out |
| Spec Suite |
| Available |
| Now |
1 of 3
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1st Floor
| Size | 52,440-222,219 SF |
| Term | Negotiable |
| Rental Rate | $16.25 /SF/YR |
| Space Use | Industrial |
| Build-Out | Spec Suite |
| Available | Now |
Available immediately! Capital improvements completed. https://www.145candlewoodroad.com/
- Lease rate does not include utilities, property expenses or building services
- 1 Drive Bay
- Space is in Excellent Condition
- 16 Loading Docks
- ± 222,219 SF Available (Will divide)
- Division options greater than 50,000 SF available
Property Overview
. Class A Specs at a discount to new construction. Capital improvements completed.
Warehouse Facility Facts
Building Size
313,246 SF
Lot Size
13.80 AC
Year Built
2000
Construction
Masonry
Sprinkler System
ESFR
Lighting
LED
Water
City
Heating
Gas
Gas
Natural
Power Supply
Amps: 5,000 Volts: 480
Zoning
I-1 - Foregin Trade Zone #52.
1 1
Fairly walkable
50/100
Very drivable
80/100
Limited public transit
30/100
Fairly bikeable
50/100
1 of 13
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1






