Log In/Sign Up
Your email has been sent.
Investment Highlights
- Great access to Interstate 76 (One-Min Drive) & Interstate 77 (Four-Min Drive) & Rail Accessible via Wheeling & Lake Erie Railway Company.
- With a new substation, the site could deliver 8-10 megawatts.
- Fresh river water ensures a reliable supply for various industrial processes and operational needs.
- Capacity prior to the vandalism of the onsite 1.5 MW substation was 3-5 Mega Watts.
- 138kv line running nearby. If connected via a large substation, the site could deliver power in the 25-50 megawatt range.
- Located in the East Akron Opportunity Zone.
Executive Summary
According to our preliminary discussions with First Energy in 2021, the site had a power capacity of 3-5 megawatts. This capacity could be increased to 8-10 megawatts with the necessary substation upgrades.
Furthermore, a nearby 138 kV line could boost the power capacity to an impressive 25-50 megawatts if utilized in conjunction with additional substation upgrades. This potential for high power capacity makes the site particularly attractive for energy-intensive industries.
Rail access is available via the Wheeling and Lake Erie Railway, offering a crucial logistical advantage for transporting goods and materials.
The site also benefits from access to fresh water from the river, ensuring a reliable supply for various industrial processes and operational requirements.
With its strategic location, substantial power capacity, dependable water supply, and excellent rail access, this industrial land site presents a compelling opportunity for redevelopment. Whether for manufacturing, logistics, or other industrial applications, the site's potential is immense and ready for transformation.
- Great access to Interstate 76 (One-Min Drive) & Interstate 77(Four-Min Drive).
- Capacity prior to the vandalism of the onsite 1.5 MW substation was 3-5 megawatts.
- With a new substation, the site could deliver 8-10 megawatts.
- 138kv line running nearby. If connected via a large substation, the site could deliver power in the 25-50 megawatt range.
- Rail Accessible via Wheeling & Lake Erie Railway Company.
- Fresh river water ensures a reliable supply for various industrial processes and operational needs.
- Located in the East Akron Opportunity Zone.
Furthermore, a nearby 138 kV line could boost the power capacity to an impressive 25-50 megawatts if utilized in conjunction with additional substation upgrades. This potential for high power capacity makes the site particularly attractive for energy-intensive industries.
Rail access is available via the Wheeling and Lake Erie Railway, offering a crucial logistical advantage for transporting goods and materials.
The site also benefits from access to fresh water from the river, ensuring a reliable supply for various industrial processes and operational requirements.
With its strategic location, substantial power capacity, dependable water supply, and excellent rail access, this industrial land site presents a compelling opportunity for redevelopment. Whether for manufacturing, logistics, or other industrial applications, the site's potential is immense and ready for transformation.
- Great access to Interstate 76 (One-Min Drive) & Interstate 77(Four-Min Drive).
- Capacity prior to the vandalism of the onsite 1.5 MW substation was 3-5 megawatts.
- With a new substation, the site could deliver 8-10 megawatts.
- 138kv line running nearby. If connected via a large substation, the site could deliver power in the 25-50 megawatt range.
- Rail Accessible via Wheeling & Lake Erie Railway Company.
- Fresh river water ensures a reliable supply for various industrial processes and operational needs.
- Located in the East Akron Opportunity Zone.
Property Facts
| Sale Type | Investment or Owner User | Property Subtype | Industrial |
| Sale Condition | Redevelopment Project | Total Lot Size | 4.50 AC |
| No. Lots | 1 | No. Stories | 2 |
| Property Type | Land | Opportunity Zone |
Yes
|
| Zoning | U-5 Ordinary Industry - https://library.municode.com/oh/akron/codes/code_of_ordinances nodeId=TIT15LAUS_CH153ZOCO_ART5ACUSREDI_153.290ORINDILAU5 | ||
| Sale Type | Investment or Owner User |
| Sale Condition | Redevelopment Project |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Industrial |
| Total Lot Size | 4.50 AC |
| No. Stories | 2 |
| Opportunity Zone |
Yes |
| Zoning | U-5 Ordinary Industry - https://library.municode.com/oh/akron/codes/code_of_ordinances nodeId=TIT15LAUS_CH153ZOCO_ART5ACUSREDI_153.290ORINDILAU5 |
1 Lot Available
Lot
| Lot Size | 4.50 AC |
| Lot Size | 4.50 AC |
According to our preliminary discussions with First Energy in 2021, the site has a Power Capacity of 8-10 Megawatts. Taping into a nearby 138kv line would raise the Megawatt range to 25-50 MW.
Property Taxes
| Parcel Number | 68-21804 | Improvements Assessment | $54,310 |
| Land Assessment | $43,750 | Total Assessment | $98,060 |
Property Taxes
Parcel Number
68-21804
Land Assessment
$43,750
Improvements Assessment
$54,310
Total Assessment
$98,060
1 of 2
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
Presented by
1833 E Market St
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
Your message has been sent!
Activate your LoopNet account now to track properties, get real-time alerts, save time on future inquiries, and more.


