Investment Highlights

  • Two-site Bitcoin mining campus totaling 14 MW with 10-year low-cost power at $0.0372/kWh, providing immediate operational capability.
  • Prime location offering an 8-MW live load, with an approved 4-MW expansion, and multiple high-performing Disruptor 2000 mining containers.
  • 10-year power contracts through South Central Public Power District.
  • Possible expansion of the runway to 25 MW at Blue Hill Substation positions the platform for scalable future growth for enhanced value.

Executive Summary

14 MW OPERATIONAL BITCOIN MINING CAMPUS | NEBRASKA
Rare opportunity to acquire a fully operational, revenue-generating Bitcoin mining platform consisting of two commissioned facilities in south-central Nebraska. The portfolio includes the Lawrence (Webster County) and Sutton (Clay County) campuses, representing approximately 14 MW of contracted power capacity with immediate operational control upon closing.
Unlike development-stage mining projects, both facilities are fully built, energized, and actively producing revenue, eliminating construction, permitting, interconnection, and commissioning risk.
POWER ADVANTAGE
The campuses operate under long-term power agreements with South Central Public Power District, providing a blended average electricity rate of approximately $0.0372/kWh. The current agreements provide power certainty through a 10-year contracted structure, positioning the operation among the most competitive power-cost environments in North America.
Both locations feature dedicated fiber connectivity with Starlink redundancy to maximize uptime and operational resilience.
LAWRENCE CAMPUS
Located on approximately 0.46 acres adjacent to its serving substation, the Lawrence facility currently supports 8 MW of active mining load with an additional 4 MW expansion already approved.
Infrastructure includes:
• Three RK Disruptor 2000 MK II mining containers
• One Digital Shovel Mini-Pod M300
• Fully fenced and secured perimeter
• Controlled gate access
• Dedicated fiber connectivity
• Immediate substation adjacency
SUTTON CAMPUS
Located on approximately 1.18 acres adjacent to its serving substation, the Sutton facility currently operates approximately 2 MW of active mining load.
Infrastructure includes:
• Digital Shovel Mini-Pod M300
• Fully fenced and secured perimeter
• Controlled gate access
• Dedicated fiber connectivity
• Immediate substation adjacency
MINING FLEET
The portfolio includes approximately 2,490 deployed miners consisting primarily of:
• Bitmain Antminer S19 K Pro
• Bitmain Antminer S19 J Pro
• Bitmain Antminer S19 Pro
• Bitmain Antminer L7
• ElphaPex DG1+
Documented infrastructure and equipment acquisition costs exceed $3.6 million.
OPERATING PERFORMANCE
Detailed operating statements, production history, power agreements, and supporting documentation are available through the data room upon execution of a confidentiality agreement.
EXPANSION POTENTIAL
The acquisition provides a clear pathway for future growth. A potential 25 MW expansion opportunity has been identified through the Blue Hill Substation, creating a scalable platform for operators seeking to increase capacity beyond the existing footprint.
TRANSACTION STRUCTURE
Ownership is open to multiple transaction structures, including:
• Turnkey operation with mining fleet included
• Infrastructure-only acquisition
• Customized transaction structures for qualified buyers
Data room access available following NDA execution. Letter of Intent required prior to advanced due diligence.

Property Facts

Sale Type Investment
Sale Condition Bulk/Portfolio Sale
No. Lots 1
Property Type Land
Property Subtype Commercial
Proposed Use Power Center
Total Lot Size 0.23 AC
Year Built 1964
Zoning 05-AGRICUL - Both sites are zoned AG-G, General Agricultural District. Current use as energy/data infrastructure and permitted under existing approvals.

1 Lot Available

Lot

Lot Size 0.23 AC

Operational Bitcoin mining site. 8 MW live load, 4 MW expansion approved. 10-year power contract at $0.0372/kWh through South Central Public Power District. Adjacent to serving substation. Fenced, gated, revenue-producing.

Description

14 MW operational Bitcoin mining campus across two purpose-built sites in south-central Nebraska. Constructed between 2023 and 2024. Both sites are fully energized, revenue-producing, and configured for immediate buyer takeover. The Lawrence facility (Webster County) hosts 8 MW of active load across four mining containers on 0.46 acres, with an additional 4 MW expansion already approved. The Sutton facility (Clay County) hosts 2 MW via a Digital Shovel Mini-Pod M300 on 1.18 acres. Both sites are fully fenced, gate-controlled, and positioned directly adjacent to their serving substations — minimizing transmission losses and operational risk. Power is secured under 10-year agreements with South Central Public Power District at a blended average rate of $0.0372/kWh. Both sites run carrier-grade fiber with Starlink redundancy. Financials verified and available in data room under NDA. Future expansion to 25 MW identified at Blue Hill Substation (2029). Seller open to asset sale or infrastructure-only transaction.

Exceptionally drivable
100/100
Not bikeable
10/100

Property Taxes

Property Taxes

Parcel Number
0006108.00
Land Assessment
$192,950
Improvements Assessment
$101,220
Total Assessment
$294,170

Sale Advisor

Sale Advisor

Richard Lowrance, Seller Representative
Richard Lowrance is one of the founding members of PropertyCashin. For over five years, he has concentrated on commercial real estate, with a strong emphasis on data and infrastructure development. Their main markets are Dallas/Fort Worth, Houston, San Antonio, and the Los Angeles area.
  • Listing ID: 39920903

  • Date on Market: 3/26/2026

  • Last Updated:

  • Address: 2118 Road 2800, Lawrence, NE 68957

Contact the Sale Advisor

2118 Road 2800

Have an account? Log In

What's your inquiry about?*

Select Option

Select at least one option

Preferred Date*

Preferred date is required

First Name*

Last Name*

Email*

Email address is required

Phone*

Ext (optional)

Company (optional)

Message*

Message is required

{{getContactFormMessageFieldCharacterCount()}} out of 600

New to LoopNet? No problem. We'll automatically create a free account for you. By clicking the button, you agree to LoopNet's Terms of Use and Privacy Notice.

Hmm, there seems to have been an error sending your message. Please refresh the page and try again.

Your message has been sent.
Link copied
Your LoopNet account has been created!

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, "rating") }}
255 character limit ({{ remainingChars() }} charactercharacters remainingover)
{{ getErrorText(feedbackForm.msg, "rating") }}
{{ getErrorText(feedbackForm.fname, "first name") }}
{{ getErrorText(feedbackForm.lname, "last name") }}
{{ getErrorText(feedbackForm.phone, "phone number") }}
{{ getErrorText(feedbackForm.phonex, "phone extension") }}
{{ getErrorText(feedbackForm.email, "email address") }}