Your email has been sent.
Investment Highlights
- Two-site Bitcoin mining campus totaling 14 MW with 10-year low-cost power at $0.0372/kWh, providing immediate operational capability.
- Prime location offering 8 MW live load, with approved 4 MW expansion, and multiple high-performing Disruptor 2000 mining containers.
- Turnkey fully fenced, fully operational Bitcoin mines built between 2023–2024 with immediate takeover and no development or lease-up risk.
- Possible expansion of the runway to 25 MW at Blue Hill Substation positions the platform for scalable future growth for enhanced value.
Executive Summary
Property Facts
| Sale Type | Investment | Property Subtype | Residential |
| No. Lots | 1 | Total Lot Size | 0.23 AC |
| Property Type | Land | Year Built | 1964 |
| Zoning | 05-AGRICUL - The Lawrence site (2118 Rd 2400, Webster County) and the Sutton site (37102 Rd U, Clay County) is zoned AG-G, General Agricultural District. | ||
| Sale Type | Investment |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Residential |
| Total Lot Size | 0.23 AC |
| Year Built | 1964 |
| Zoning | 05-AGRICUL - The Lawrence site (2118 Rd 2400, Webster County) and the Sutton site (37102 Rd U, Clay County) is zoned AG-G, General Agricultural District. |
1 Lot Available
Lot
| Lot Size | 0.23 AC |
| Lot Size | 0.23 AC |
Turnkey Bitcoin mining site in Lawrence, Nebraska. Fully energized with established infrastructure, stable low-cost power, and immediate operational capability. Scalable footprint with expansion potential.
Description
Discover 2118 Road 2800in Lawrence, Nebraska, a turnkey, ultra-low-power Bitcoin mining campus comprising two fully built, operational sites in south-central Nebraska, totaling 14 MW of contracted capacity. The Lawrence facility (Webster County) sits on 0.46 acres and hosts 8 MW of active load with an additional 4 MW expansion already approved, deploying four mining containers (three RK Disruptor 2000 units and one Digital Shovel Mini-Pod M300). The Sutton facility (Clay County) sits on 1.18 acres and hosts 2 MW of active load via a Digital Shovel Mini-Pod M300. Each site is positioned immediately adjacent to its serving substation, fully fenced and gate-controlled, on level at-grade terrain, and is supported by 10-year power agreements through South Central Public Power District at a blended average rate of $0.0372/kWh. Lawrence is served by carrier-grade dedicated fiber with Starlink redundancy; Sutton mirrors the same low-latency upstream configuration. Constructed in 2023-2024, both facilities are commissioned, revenue-producing, and configured for immediate buyer takeover with no build-out risk. A future 25 MW expansion path has been identified at the Blue Hill Substation (2029), providing an acquirer with a clear runway to scale the platform beyond its existing 14 MW footprint.
Property Taxes
| Parcel Number | 0006108.00 | Improvements Assessment | $101,220 |
| Land Assessment | $192,950 | Total Assessment | $294,170 |
Property Taxes
Sale Advisor
Richard Lowrance, Seller Representative
Presented by
2118 Road 2800
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.