Log In/Sign Up
Your email has been sent.
HIGHLIGHTS
- Spec office, move in ready
- Insulated with fire sprinklers
- Three phase power available
FEATURES
Clear Height
20’
Drive In Bays
4
Standard Parking Spaces
22
ALL AVAILABLE SPACE(1)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
The building can be demised to 5,106 SF. The building was designed to allow for more and bigger doors if needed. 20 foot clear heights. Fully insulated. Sprinkled.
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- Fully insulated building w/ sprinklers
- 3 Drive Ins
- Grade level doors 12'x14'
- Great location, close to SH130
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor - 100 | 5,106-17,642 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | Shell Space | Now |
1st Floor - 100
| Size |
| 5,106-17,642 SF |
| Term |
| Negotiable |
| Rental Rate |
| Upon Request Upon Request Upon Request Upon Request |
| Space Use |
| Industrial |
| Condition |
| Shell Space |
| Available |
| Now |
1st Floor - 100
| Size | 5,106-17,642 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | Shell Space |
| Available | Now |
The building can be demised to 5,106 SF. The building was designed to allow for more and bigger doors if needed. 20 foot clear heights. Fully insulated. Sprinkled.
- Lease rate does not include utilities, property expenses or building services
- 3 Drive Ins
- Space is in Excellent Condition
- Grade level doors 12'x14'
- Fully insulated building w/ sprinklers
- Great location, close to SH130
PROPERTY OVERVIEW
This is Phase II of Headwaters Benelli Industrial Development. Phase I can be found and used as a reference at 109 Benelli. Construction began July 2023, and will be completed February 2024.
WAREHOUSE FACILITY FACTS
Building Size
25,300 SF
Lot Size
3.00 AC
Year Built
2024
Construction
Metal
Sprinkler System
Wet
Water
County
Sewer
Septic Field
Power Supply
Phase: 3
Zoning
ETJ - None, Hutto ETJ
1 1
1 of 9
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
1 of 1
Presented by
216 Benelli
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.



