Your email has been sent.
INVESTMENT HIGHLIGHTS
- 12 acre industrial site suitable for GMP facility, life science, or distribution.
- Existing frontage on State Route 122.
- Site designated by Town for expedited permitting as a C.43 Priority Development Site.
- Located immediately off Exit 96 Mass Pike in Grafton, MA.
- Served by Eversource gas, National Grid electric, public sewer and water.
- Certified Platinum BioReady Community.
EXECUTIVE SUMMARY
PROPERTY FACTS
| Sale Type | Investment | Proposed Use | |
| No. Lots | 1 | Total Lot Size | 12.00 AC |
| Property Type | Land | No. Stories | 2 |
| Property Subtype | Industrial | ||
| Zoning | I - Industrial | ||
| Sale Type | Investment |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Industrial |
| Proposed Use | |
| Total Lot Size | 12.00 AC |
| No. Stories | 2 |
| Zoning | I - Industrial |
1 LOT AVAILABLE
Lot
| Lot Size | 12.00 AC |
| Lot Size | 12.00 AC |
Vacant land adjacent to Wyman Gordon manufacturing facility. The parcel benefits from existing frontage on State Route 122 and is fully served by public utilities including Eversource gas, National Grid electric, public water, and sewer.
DESCRIPTION
Positioned at the intersection of industrial innovation and strategic accessibility, this ±12-acre development parcel at 244 Worcester Street in Grafton, MA offers a rare opportunity for users in GMP manufacturing, life sciences, logistics, and medical device sectors. Located just two minutes off Exit 96 of the Massachusetts Turnpike, the site provides seamless connectivity to both the Boston and Worcester metropolitan areas, making it ideal for regional distribution or specialized production. The parcel benefits from existing frontage on State Route 122 and is fully served by public utilities including Eversource gas, National Grid electric, public water, and sewer. As a designated Chapter 43 Priority Development Site, the property qualifies for expedited permitting, significantly reducing development timelines. Additionally, Grafton’s status as a Certified Platinum BioReady Community underscores its readiness to support biotech and advanced manufacturing operations. Adjacent to the 1 million square foot Wyman Gordon manufacturing facility, the site is surrounded by a robust industrial ecosystem. Its location within a high-demand corridor for biomanufacturing and logistics positions it to capture ongoing market momentum. With 8.8 acres of upland and a total of 12.3 acres, the site offers flexibility for a range of build-to-suit or speculative development strategies.
Presented by
244 Worcester St - Industrial
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.

