Log In/Sign Up
Your email has been sent.
HIGHLIGHTS
- Estimated Completion Q4 2024
- 40’ Clearance; ESFR Sprinklers
- 5 miles from the San Bernardino International Airport
- 27 DH Doors; 35 Trailer Stalls; 180’ Truck Court
- Fifteen (15) – 45,000 lb mechanical pitted dock levelers
- Immediate access to the I—10 and 210 freeways
FEATURES
Clear Height
40’
Drive In Bays
1
Exterior Dock Doors
27
Levelers
15
Standard Parking Spaces
161
ALL AVAILABLE SPACE(1)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
±6,000 SF of high image two (2) story office space
- Includes 6,000 SF of dedicated office space
- 27 Loading Docks
- 1 Drive Bay
- Walls tilted
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor | 208,000 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | Now |
1st Floor
| Size |
| 208,000 SF |
| Term |
| Negotiable |
| Rental Rate |
| Upon Request Upon Request Upon Request Upon Request |
| Space Use |
| Industrial |
| Condition |
| - |
| Available |
| Now |
1 of 5
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
1st Floor
| Size | 208,000 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | - |
| Available | Now |
±6,000 SF of high image two (2) story office space
- Includes 6,000 SF of dedicated office space
- 1 Drive Bay
- 27 Loading Docks
- Walls tilted
DISTRIBUTION FACILITY FACTS
Building Size
208,000 SF
Lot Size
9.54 AC
Year Built
2025
Truck Court
180’
Sprinkler System
ESFR
Lighting
LED
Power Supply
Amps: 2,000 Volts: 277-480 Phase: 3
Zoning
LI - Light Industrial
1 1
1 of 4
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
1 of 1
Presented by
27195 Almond Ave
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.






