Log In/Sign Up
Your email has been sent.
Garner Business Park Building 6 4520 Guy Rd 75,000 - 236,600 SF of 4-Star Industrial Space Available in Clayton, NC 27520



Highlights
- Direct access to US 70. Near I-40 and future I-540 intersections
Features
Clear Height
32’
Column Spacing
50’ x 60’
Warehouse Floor
7”
Drive In Bays
2
Exterior Dock Doors
24
Levelers
10
Standard Parking Spaces
267
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Build-Out
- Available
Available Space: 236,600 SF (728-0’ long x 325’ deep) Landlord will consider subdividing. Office Space: 2,000 SF Make ready Office (MRO)
- Includes 2,000 SF of dedicated office space
| Space | Size | Term | Rental Rate | Space Use | Build-Out | Available |
| 1st Floor | 75,000-236,600 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | September 01, 2026 |
1st Floor
| Size |
| 75,000-236,600 SF |
| Term |
| Negotiable |
| Rental Rate |
| Upon Request Upon Request Upon Request Upon Request |
| Space Use |
| Industrial |
| Build-Out |
| - |
| Available |
| September 01, 2026 |
1 of 1
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1st Floor
| Size | 75,000-236,600 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Build-Out | - |
| Available | September 01, 2026 |
Available Space: 236,600 SF (728-0’ long x 325’ deep) Landlord will consider subdividing. Office Space: 2,000 SF Make ready Office (MRO)
- Includes 2,000 SF of dedicated office space
Property Overview
Aluminum/Glass Storefront: 2 Total (1 on each corner) Class-A grade office entrances with enhanced aluminum features. Clear Height: 32' minimum clear height starting at speed bay column line. 30 truck positions +52 trailer storage spaces, 10 dock packages include 40,000 lb. capacity mechanical pit leveler, dock seal & swing arm light. For lease or sale.
Warehouse Facility Facts
Building Size
236,600 SF
Lot Size
33.62 AC
Year Built
2026
Construction
Reinforced Concrete
Sprinkler System
ESFR
Lighting
LED
Water
City
Sewer
City
Gas
Natural
Power Supply
Amps: 2,000 Volts: 480
Zoning
LI (CD) - Light Industrial Garner Jurisdiction
1 1
Somewhat walkable
20/100
Exceptionally drivable
100/100
Somewhat bikeable
30/100
1 of 7
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1


