Investment Highlights
- Approximately 99,600 square feet of total building area across five floors plus two lower levels.
- Robust power infrastructure with an overall capacity of approximately 7,083 kVA supported by multiple PG&E transformers.
- Delivered vacant with six efficient floors totaling around 91,200 square feet available for new users.
- Equipped with an existing Cummins generator offering 1000KW/1250KVA emergency backup power
Executive Summary
The building was originally constructed in 1912 by Peseo Righetti & August G. Headman. The building features 5 floors plus two lower levels totaling approximately 99,600 square feet. The building is constructed of reinforced concrete and has recessed loading docks on its western side which are adjacent to a freight elevator serving all levels. The eastern side of the building has a drive-in door leading to a small indoor parking area.
Property Facts
Sale Type
Investment
Property Type
Office
Building Size
99,500 SF
Building Class
B
Year Built/Renovated
1912/1989
Percent Leased
100%
Tenancy
Multiple
Building Height
5 Stories
Typical Floor Size
19,900 SF
Building FAR
4.86
Lot Size
0.47 AC
Zoning
M1, San Francisco
Parking
37 Spaces (0.37 Spaces per 1,000 SF Leased)
1 1
Exceptionally walkable
90/100
Moderately drivable
70/100
Exceptional public transit
100/100
Moderately bikeable
60/100
Property Taxes
| Parcel Number | 3774-074 | Improvements Assessment | $2,718,134 |
| Land Assessment | $9,757,431 | Total Assessment | $12,475,565 |
Property Taxes
Parcel Number
3774-074
Land Assessment
$9,757,431
Improvements Assessment
$2,718,134
Total Assessment
$12,475,565