Log In/Sign Up
Your email has been sent.
Investment Highlights
- 26,325 SF M-2 industrial on 1.50 AC
- 13,125 SF new warehouse (2025)
- Five 12'×14' grade doors
- Heavy 600A 3-phase power + 200A office service
- Upstairs office with full kitchen + full bath
- 39,015 SF fenced yard with electric gate
Executive Summary
Heavy-power (600 amps + 200 amps) M-2 industrial facility totaling 26,325 SF across two buildings with a 1.50-AC fenced yard, four grade-level doors, and a new 13,125 SF warehouse constructed in 2025. The main building includes office space with an upstairs full kitchen + full bath. Strong regional access with I-5 (5–6 mi), OR-99E, and nearby PNWR rail transload in Junction City.
Building Status*: Existing + New Construction
Building Areas
Main Building: 13,200 SF
New Building: 13,125 SF
Total Building Area: 26,325 SF
Building Details
Floors*: 2 (Main bldg)
Year Built*: Main 1999 • New Warehouse 2025
Tenancy: Vacant
Construction Type: Metal industrial
Clear Heights (Updated)
Main: ~17' wall / ~22' eave
New Warehouse: ~18' wall / ~21' eave
Grade Doors
Main: (3) 12'×14' (2 manual, 1 electric)
New: (2) 12'×14' manual
Slab Thickness
Main: 12"
New: 4" slab
Utilities
Electric: Pacific Power
Water/Sewer: City of Harrisburg
Natural Gas: NW Natural
Garbage: Republic Services
Power Infrastructure (From OM – fully updated)
Shop Power: 600A @ 480/277V, 3-phase
Office Power: 200A @ 120/240V, 1-phase
Transformers: 75 kVA & 37.5 kVA
Step-Downs: 208/120V and 120/240V
Distribution: A/B/C phase panel runs
Parking / Yard
Land Area: 1.50 AC (65,340 SF)
Yard Area (calculated): ~39,015 SF
Fully fenced with electric gate
2.5 to 1 Land to building
Zoning
Zoning: M-2 General Industrial
Zoning Description: Heavy industrial uses — see Appendix for code
Access & Transportation
I-5 Access: ~5–6 mi (˜8–10 minutes)
OR-99E: Adjacent arterial route
Rail: PNWR corridor
Nearest Transload: Savage Junction City Rail Terminal (~5 mi S)
Building Status*: Existing + New Construction
Building Areas
Main Building: 13,200 SF
New Building: 13,125 SF
Total Building Area: 26,325 SF
Building Details
Floors*: 2 (Main bldg)
Year Built*: Main 1999 • New Warehouse 2025
Tenancy: Vacant
Construction Type: Metal industrial
Clear Heights (Updated)
Main: ~17' wall / ~22' eave
New Warehouse: ~18' wall / ~21' eave
Grade Doors
Main: (3) 12'×14' (2 manual, 1 electric)
New: (2) 12'×14' manual
Slab Thickness
Main: 12"
New: 4" slab
Utilities
Electric: Pacific Power
Water/Sewer: City of Harrisburg
Natural Gas: NW Natural
Garbage: Republic Services
Power Infrastructure (From OM – fully updated)
Shop Power: 600A @ 480/277V, 3-phase
Office Power: 200A @ 120/240V, 1-phase
Transformers: 75 kVA & 37.5 kVA
Step-Downs: 208/120V and 120/240V
Distribution: A/B/C phase panel runs
Parking / Yard
Land Area: 1.50 AC (65,340 SF)
Yard Area (calculated): ~39,015 SF
Fully fenced with electric gate
2.5 to 1 Land to building
Zoning
Zoning: M-2 General Industrial
Zoning Description: Heavy industrial uses — see Appendix for code
Access & Transportation
I-5 Access: ~5–6 mi (˜8–10 minutes)
OR-99E: Adjacent arterial route
Rail: PNWR corridor
Nearest Transload: Savage Junction City Rail Terminal (~5 mi S)
Property Facts
Amenities
- Fenced Lot
Utilities
- Water - City
- Sewer - City
1 1
Property Taxes
| Parcel Number | 0862318 | Improvements Assessment | $0 |
| Land Assessment | $0 | Total Assessment | $1,027,850 |
Property Taxes
Parcel Number
0862318
Land Assessment
$0
Improvements Assessment
$0
Total Assessment
$1,027,850
1 of 64
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1
Presented by
810 S 2nd St
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
Your message has been sent!
Activate your LoopNet account now to track properties, get real-time alerts, save time on future inquiries, and more.



