Your email has been sent.
Highlights
- Class A new construction with a 24-foot clear height and fully insulated metal structure.
- Two dock doors and two drive-in doors for versatile loading and distribution needs.
- Potential property tax abatement and incentives available through the City of Fairfield.
- Strategic location minutes from I-75 and I-275, providing strong regional access.
- Heavy-duty truck court and outdoor storage yard designed for industrial operations.
Features
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Condition
- Available
Tri-State Industrial Park offers a 12,000 SF build-to-suit industrial facility on a 2-acre site in Fairfield, Ohio. The building will feature 24-foot clear height, 6-inch reinforced concrete floors, and LED lighting throughout. Loading options include two dock doors with mechanical levelers and two drive-in doors with motorized openers. The site provides a heavy-duty truck court, outdoor storage yard, and 35 striped parking spaces. Located minutes from I-75 and I-275, the property ensures convenient regional access for distribution and logistics operations. Construction is scheduled to begin in Q2 2025 with completion in Q2 2026.
- Lease rate does not include utilities, property expenses or building services
- 2 Loading Docks
- 2 Drive Ins
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor | 12,000 SF | Negotiable | $20.00 /SF/YR $1.67 /SF/MO $240,000 /YR $20,000 /MO | Industrial | - | June 01, 2026 |
1st Floor
| Size |
| 12,000 SF |
| Term |
| Negotiable |
| Rental Rate |
| $20.00 /SF/YR $1.67 /SF/MO $240,000 /YR $20,000 /MO |
| Space Use |
| Industrial |
| Condition |
| - |
| Available |
| June 01, 2026 |
1st Floor
| Size | 12,000 SF |
| Term | Negotiable |
| Rental Rate | $20.00 /SF/YR |
| Space Use | Industrial |
| Condition | - |
| Available | June 01, 2026 |
Tri-State Industrial Park offers a 12,000 SF build-to-suit industrial facility on a 2-acre site in Fairfield, Ohio. The building will feature 24-foot clear height, 6-inch reinforced concrete floors, and LED lighting throughout. Loading options include two dock doors with mechanical levelers and two drive-in doors with motorized openers. The site provides a heavy-duty truck court, outdoor storage yard, and 35 striped parking spaces. Located minutes from I-75 and I-275, the property ensures convenient regional access for distribution and logistics operations. Construction is scheduled to begin in Q2 2025 with completion in Q2 2026.
- Lease rate does not include utilities, property expenses or building services
- 2 Drive Ins
- 2 Loading Docks
Property Overview
Tri-State Industrial Park offers a new Class A industrial facility in Fairfield, Ohio, designed for modern distribution and light manufacturing needs. This 12,000 SF pre-engineered, fully insulated metal building will feature a 24-foot clear height, 6-inch reinforced concrete floors, and LED lighting throughout. The property includes two 9’ x 10’ dock doors with mechanical levelers and two 16’ x 16’ drive-in doors with motorized openers, providing flexible loading options. Situated on a 2-acre site, the development includes a heavy-duty truck court, outdoor storage yard, and 35 striped parking spaces. The building will be equipped with 480/277V, 3-phase, 400-amp electrical service, natural gas-fired unit heaters in the warehouse, and full HVAC in the office area. Located minutes from I-75 via Union Centre Blvd and I-275 at Seward and Route 4, the site offers excellent regional connectivity for logistics and distribution. Construction is scheduled to commence in Q2 2025 with substantial completion in June 2026.
Warehouse Facility Facts
Presented by
9381 Seward Rd
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.



