Your email has been sent.
9596 Johnson Rd - Vacant 9.7-acres at SCE Phelan Substation 9.73 Acres of Commercial Land Offered at $950,000 in Phelan, CA 92371



Investment Highlights
- Excellent Utility-Scale BESS site next to SCE substation, short gen-tie
- Scalable merchant BESS and/or C-16 candidate
- Previously disturbed level site, straight-forward County permitting pathway
Executive Summary
Properties highly suitable for battery energy storage system (BESS) development are relatively scarce and currently in demand by experienced energy storage developers. Pricing is based on the strategic infrastructure value of the site for utility-scale BESS development rather than conventional vacant land comparables. Key valuation factors include grid position, utility adjacency, permitting feasibility, and the absence of major environmental constraints.
Utility-scale BESS land economics differ materially from conventional vacant land valuation metrics. Depending on project size, qualified California BESS sites may support long-term lease structures with multi-million-dollar aggregate values over the operating life of the project. As a result, strategic grid-adjacent properties are often valued based on infrastructure development potential rather than traditional land comparables.
Property Facts
| Price | $950,000 | Property Subtype | Commercial |
| Sale Type | Investment or Owner User | Proposed Use | Industrial |
| No. Lots | 1 | Total Lot Size | 9.73 AC |
| Property Type | Land | Cross Streets | Phelan Road |
| Zoning | CS - Commercial Service - Zoning allows utility-scale BESS with County Use Permit approval, per County Pre-Application review of conceptual 400 MWh BESS site plan | ||
| Price | $950,000 |
| Sale Type | Investment or Owner User |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Commercial |
| Proposed Use | Industrial |
| Total Lot Size | 9.73 AC |
| Cross Streets | Phelan Road |
| Zoning | CS - Commercial Service - Zoning allows utility-scale BESS with County Use Permit approval, per County Pre-Application review of conceptual 400 MWh BESS site plan |
1 Lot Available
Lot
| Price | $950,000 | Lot Size | 9.73 AC |
| Price Per AC | $97,636.18 |
| Price | $950,000 |
| Price Per AC | $97,636.18 |
| Lot Size | 9.73 AC |
Vacant 9.7-acre parcel adjoining SCE Phelan Substation, Phelan, CA. Utility-Scale BESS development site. 12-kV, 33-kV, 115-kV circuits.
Description
Vacant 9.7-acre parcel directly adjoining Southern California Edison’s Phelan Substation in San Bernardino County, California. Advanced-stage utility-scale Battery Energy Storage System (BESS) development opportunity with potential access to SCE 115-kV infrastructure serving the Victor Valley / High Desert reliability corridor. ________________________________________ Phelan Substation Utility-Scale Battery Energy Storage Development Opportunity Location: Adjacent to Southern California Edison’s Phelan Substation Utility: Southern California Edison (SCE) Jurisdiction: San Bernardino County, California Parcel Size: Approximately 9.7 acres Zoning: Service Commercial (CS) Entitlement Status: County pre-application review completed Use Potential: Utility-scale standalone BESS and related utility infrastructure subject to Conditional Use Permit approval ________________________________________ Why This Site Matters 115-kV High Desert Storage Platform The property directly adjoins the SCE Phelan Substation and offers immediate proximity to multiple voltage classes, including: • 12-kV distribution infrastructure • 33-kV subtransmission infrastructure • 115-kV transmission/subtransmission infrastructure The 115-kV system includes circuits interconnected toward SCE’s Victor Substation and broader Southern California reliability network, creating potential pathways for larger utility-scale storage development. Potential utility-scale RA opportunity The site may support medium- to utility-scale standalone battery storage configurations, including potential 4-hour Resource Adequacy (RA) applications subject to interconnection review. The parcel appears physically capable of supporting large-scale BESS deployment in the 200–400+ MWh range depending on final engineering, technology selection, setbacks, and interconnection configuration. Advanced-stage entitlement candidate Substantial early-stage permitting and environmental work has already been completed, materially reducing development uncertainty. Completed investigations include: • biological assessment with no sensitive biological resource findings • cultural resources assessment with no significant cultural findings • Phase I Environmental Site Assessment with no recognized environmental conditions San Bernardino County pre-application review confirmed that utility-scale BESS is an allowable use within the existing Commercial land use designation subject to CUP approval. No General Plan Amendment or rezoning identified. ________________________________________ Strategic High Desert Location The Phelan node remains relatively underbuilt compared with many California storage locations and functions as part of the broader Victor Valley / High Desert electrical system. The property offers: • direct substation adjacency • short potential gen-tie pathways • flat developable land • paved road access from Johnson Road • proximity to growing Southern California load-serving infrastructure Compared with many California energy development sites, the project benefits from a substantially narrowed anticipated CEQA scope focused primarily on: • visual analysis • operational noise • lighting • standard air quality and engineering studies • hazard management review ________________________________________ Interconnection / Development Considerations Based on preliminary interconnection review and SCE Cluster 15 findings: • reviewed 115-kV discharge scenarios did not identify major overload-related discharge constraints • charging constraints appear concentrated during summer daytime peak periods • significantly greater charging availability exists overnight and during early morning hours • overnight charging profiles may support larger 4-hour BESS systems than an initial surface-level review might suggest Potential development pathways may include: • utility-scale standalone BESS • Resource Adequacy-oriented storage • merchant storage • grid reliability / non-wires applications • future hybrid storage configurations ________________________________________ County Review Status San Bernardino County pre-application review completed. County review identified a focused permitting pathway centered primarily on: • visual impact analysis • operational noise analysis • hazard management / fire safety review • standard drainage and engineering review Estimated County review timeline: approximately 210–300 days depending on application completeness and technical studies. ________________________________________ Offering 9.7-acre substation-adjacent parcel offered for: • sale • long-term ground lease • or joint venture participation Preliminary interconnection analysis, County review documents, biological assessment, cultural resources assessment, and Phase I ESA materials available during due diligence period. Please note: Seller is engaging only with parties evaluating the opportunity at a transaction or active due diligence level, including pricing, structure, interconnection evaluation, or development review. Additional California substation-adjacent energy development opportunities available.
Property Taxes
| Parcel Number | 3066-331-06 | Improvements Assessment | $0 |
| Land Assessment | $428,400 | Total Assessment | $428,400 |
Property Taxes
Presented by
Roy McDonald LLC
9596 Johnson Rd - Vacant 9.7-acres at SCE Phelan Substation
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
