Log In/Sign Up
Your email has been sent.
Graybar Electric 975 E Tallmadge Ave 39,204 SF Industrial Building Akron, OH 44310 $1,700,000 ($43.36/SF)



EXECUTIVE SUMMARY
• 39,204/SF warehouse/office building located on high traffic corridor in dense industrial park.
• Completely renovated in 2012 with incredible finishes in the office space, kitchen/breakroom, and restrooms.
• 3 Phase, 600A service to warehouse.
• 14’ overhead door on the north side, accessible by neighboring properties parking lot.
• One loading dock, and four overhead doors on the west side. One overhead door is being used as a dock the other two could be converted to docks if railing was removed.
• Chattel to stay upon request: cubicles, scissor lift, forklift, walk-behind floor scrubber, riding floor scrubber, walk-behind pallet lift and plenty of racking.
• Tenant will be completely out by the end of the year (2025).
• Completely renovated in 2012 with incredible finishes in the office space, kitchen/breakroom, and restrooms.
• 3 Phase, 600A service to warehouse.
• 14’ overhead door on the north side, accessible by neighboring properties parking lot.
• One loading dock, and four overhead doors on the west side. One overhead door is being used as a dock the other two could be converted to docks if railing was removed.
• Chattel to stay upon request: cubicles, scissor lift, forklift, walk-behind floor scrubber, riding floor scrubber, walk-behind pallet lift and plenty of racking.
• Tenant will be completely out by the end of the year (2025).
TAXES & OPERATING EXPENSES (ACTUAL - 2025) Click Here to Access |
ANNUAL | ANNUAL PER SF |
|---|---|---|
| Taxes |
-
|
-
|
| Operating Expenses |
-
|
-
|
| Total Expenses |
$99,999
|
$9.99
|
TAXES & OPERATING EXPENSES (ACTUAL - 2025) Click Here to Access
| Taxes | |
|---|---|
| Annual | - |
| Annual Per SF | - |
| Operating Expenses | |
|---|---|
| Annual | - |
| Annual Per SF | - |
| Total Expenses | |
|---|---|
| Annual | $99,999 |
| Annual Per SF | $9.99 |
PROPERTY FACTS
1 1
PROPERTY TAXES
| Parcel Numbers | Improvements Assessment | $135,426 | |
| Land Assessment | $50,663 | Total Assessment | $186,089 |
PROPERTY TAXES
Parcel Numbers
Land Assessment
$50,663
Improvements Assessment
$135,426
Total Assessment
$186,089
1 of 20
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
1 of 1
Presented by
Graybar Electric | 975 E Tallmadge Ave
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
