Share This Listing

Message

919 characters remaining

Hmm, there seems to have been an error sending your message. Please try again.

Your email has been sent.

Still interested?

Contact the brokers for more information about this property

Investment Highlights

  • 459 AC | Existing Industrial Park | 2 GW+ BTM AI campus (single-tract preferred) | Two I-55 interchanges nearby
  • Initial utility power: 27 MW (Entergy 15 MW + Tallahatchie 12 MW). Newly Constructed 40 MW Substation Adjacent. Existing 500k Gallon Elevated Tank
  • State DC/AI programs benchmarked off AWS’s Mississippi package (corp tax relief, training).
  • $4.3M grading grant ? bench-ready pads; private utility corridors planned
  • Incentive-ready: FILOT up to 30 yrs; TIF; 7% sales-tax abatement potential.
  • Workforce momentum: MS-backed training & industry partnerships (AI/data center).

Executive Summary

Affordably Priced

Property Facts

Price $22,950,000
Sale Type Investment or Owner User
Sale Conditions
1031 Exchange
  • Ground Lease (Leasehold)
  • Ground Lease (Leased Fee)
  • Build to Suit
  • Lease Option
No. Lots 1
Property Type Land
Property Subtype Industrial
Proposed Use
Total Lot Size 459.00 AC
Cross Streets Route 7
Zoning Existing Industrial Park - In an existing industrial park - Grenada Business and Technology Park

1 Lot Available

Lot

Price $22,950,000
Price Per AC $50,000.00
Lot Size 459.00 AC

• $65B+ regional centered between Memphis and Jackson AI clusters • C Spire-served fiber (~3-4 mo lit path), 12-18 mo Memphis to Jackson Fiber, Dark Fiber Optionality • 718k Dths/Day Nat Gas • USACE confirmed: no Section 404 permit required

Description

±459 acres (single-tract sale preferred) inside the Grenada Business & Technology Park, positioned for a large-scale AI, cloud, or digital infrastructure campus with a 1.0-1.5 GW initial campus framework and a longer-term expansion path. The property is crossed by three TC Energy / Columbia Gulf transmission lines (two 30" lines at ~900 psi and one 36" line at ~1,000 psi). Current provider correspondence reflects approximately 484,000 Dth/day of confirmed on-site gas corridor capacity in 2025, updated to approximately 718,496 Dth/day in 2026. On the current controlled acreage, the site is being positioned as an initial 1.0-1.5 GW campus, while remaining gas-supported capacity may support longer-term brownfield/greenfield expansion, subject to additional land control, permitting, commercial structure, and final delivery design. Multiple power-structure pathways are under evaluation, including: privately funded behind-the-meter generation, utility-coordinated activation near the existing substation, and larger-scale utility-coordinated build-to-transfer (BTA)-style structures, subject to further review, commercial terms, utility studies, and approvals. A near-term site activation path is also under review adjacent to the existing substation. The broader power-delivery configuration will ultimately depend on buyer program requirements and selected commercial structure. Connectivity has advanced materially. The site now benefits from C Spire-served connectivity with: ~3-4 month lit-service availability 100G to 400G+ transport to Jackson / Memphis support for both lit services and dark fiber dual diverse routes and diverse entry points a new Jackson-Memphis route in development, with added capacity expected in 12-18 months. Due diligence materials are substantially assembled and available to qualified buyers, including: ALTA/NSPS survey Phase I ESA geotechnical report floodplain exhibits concept / resiliency plans utility and power studies incentives / FTZ documentation and USACE confirmation that no Department of the Army Section 404 permit is required based on the submitted plans. The property also sits within the broader Memphis-Jackson AI / cloud corridor, with more than $65B+ of announced regional investment across xAI, AWS, Google, Compass, and AVAIO-related projects, strengthening the case for Grenada as a central platform within an active regional growth corridor. Additional advantages may include: potential FTZ 158 trade / logistics benefits for qualifying equipment and infrastructure buildout documented local, state, and federal support materials in diligence flexible campus planning for phased deployment and future expansion. Notes: All power configurations, schedules, capacities, incentives, utility arrangements, and expansion scenarios are subject to buyer verification, engineering, commercial agreements, utility studies, and applicable approvals. Terms (guidance). Price: Affordable Notes: Gas deliverability based on TC Energy correspondence; final capacity depends on executed contracts, nominations, and pipeline operations. All figures, schedules, and plans subject to buyer verification

Not walkable
10/100
Exceptionally drivable
100/100
  • Listing ID: 38268149

  • Date on Market: 10/30/2025

  • Last Updated:

  • Address: American Way, Grenada, MS 38901

Link copied
Your LoopNet account has been created!

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, "rating") }}
255 character limit ({{ remainingChars() }} charactercharacters remainingover)
{{ getErrorText(feedbackForm.msg, "rating") }}
{{ getErrorText(feedbackForm.fname, "first name") }}
{{ getErrorText(feedbackForm.lname, "last name") }}
{{ getErrorText(feedbackForm.phone, "phone number") }}
{{ getErrorText(feedbackForm.phonex, "phone extension") }}
{{ getErrorText(feedbackForm.email, "email address") }}