Cerdanyola DC Hub Cerdanyola del Vallès, Barcelona 08290 237,538 - 529,757 SF of Industrial Space Available

Some information has been automatically translated.
PARK HIGHLIGHTS
- The project includes a data center campus of up to 49,216 square meters, making it one of the largest in Catalonia.
- The location offers exceptional connectivity to high-capacity fiber networks and is situated just 20 km from Barcelona.
- The development is designed to offer an installed capacity of 88 MW, distributed in two phases.
PARK FACTS
| Total Space Available | 529,757 SF | Park Type | Industrial Park |
| Total Space Available | 529,757 SF |
| Park Type | Industrial Park |
ALL AVAILABLE SPACES(2)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
First phase of a state-of-the-art data center, covering an area of 22,068 square meters with an installed capacity of 42 MW. Construction of this phase is expected to be completed in 14 months, with an estimated availability by the end of 2026. The project includes the installation of its own electrical substation and ensures high-capacity connections to medium-voltage networks, guaranteeing a reliable and continuous power supply.
- Data center with 42 MW of installed power
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| Ground | 237,538 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | December 01, 2026 |
1413 Bp - Ground
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
Second phase of a state-of-the-art data center, covering an area of 27,148 square meters with an installed capacity of 46 MW. The project includes the installation of its own electrical substation and ensures high-capacity connections to medium-voltage networks, guaranteeing reliable and continuous power supply.
- Data center with 46 MW of installed power
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| Ground | 292,219 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | June 01, 2027 |
12 Carrer de la Creu Casas - Ground
1413 Bp - Ground
| Size | 237,538 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | - |
| Available | December 01, 2026 |
First phase of a state-of-the-art data center, covering an area of 22,068 square meters with an installed capacity of 42 MW. Construction of this phase is expected to be completed in 14 months, with an estimated availability by the end of 2026. The project includes the installation of its own electrical substation and ensures high-capacity connections to medium-voltage networks, guaranteeing a reliable and continuous power supply.
- Data center with 42 MW of installed power
12 Carrer de la Creu Casas - Ground
| Size | 292,219 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | - |
| Available | June 01, 2027 |
Second phase of a state-of-the-art data center, covering an area of 27,148 square meters with an installed capacity of 46 MW. The project includes the installation of its own electrical substation and ensures high-capacity connections to medium-voltage networks, guaranteeing reliable and continuous power supply.
- Data center with 46 MW of installed power
Presented by
Cerdanyola DC Hub | Cerdanyola del Vallès, Barcelona 08290
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.