Your email has been sent.
Calle Gustavo Adolfo Bécquer, 7 0.3 Acres of Commercial Land Offered at $291,114 in Ponferrada, León 24404
Some information has been automatically translated.
INVESTMENT HIGHLIGHTS
- Balcony.
- Ascensor.
- Calefacción.
- Agua.
- Telephone.
- Almacén.
- Could you please provide more context or a complete sentence related to commercial real estate in Spanish for translation?
- Gas Town.
PROPERTY FACTS
| Price | $291,114 | Property Type | Land |
| Sale Type | Investment or Owner User | Property Subtype | Commercial |
| No. Lots | 1 | Total Lot Size | 0.30 AC |
| Price | $291,114 |
| Sale Type | Investment or Owner User |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Commercial |
| Total Lot Size | 0.30 AC |
1 LOT AVAILABLE
Lot
| Price | $291,114 | Lot Size | 0.30 AC |
| Price Per AC | $957,804.13 |
| Price | $291,114 |
| Price Per AC | $957,804.13 |
| Lot Size | 0.30 AC |
DESCRIPTION
GREAT INVESTMENT OPPORTUNITY IN CUATROVIENTOS!... Building consisting of 4 individual apartments arranged in a block with 2 floors, two apartments per floor. The construction is unfinished and needs to be completed... Regarding the construction: exposed brick, ceramic cladding, plastering, and exterior carpentry. Currently, there is no electricity or water supply; however, all utilities can be contracted. It is necessary to obtain water and electricity certificates for all four apartments... The building was originally constructed in 1995 for use as a furniture store and office space. There is no record of this construction in any official agency, nor are there execution plans, building permits, or any related documentation. In 2009, a project was submitted to adapt the building into 4 apartments and a commercial space (additional to the sale price: €77,000). This project and permit are available at the town hall, but despite having a signed completion certificate, it was not submitted to the town hall, and the first occupancy license was not obtained. Therefore, it is necessary to submit a legalization project to bring the building up to current regulations and complete the construction entirely. To carry out the works, a technical report and a responsible declaration must be prepared...
Presented by
Calle Gustavo Adolfo Bécquer, 7
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.