Your email has been sent.
Carrie Bell Dr - 262 AC | Renewable Energy Development 262 Acres of Commercial Land in Bainbridge, GA 39819



Investment Highlights
- 115 KV Georgia Power transmission on-site via Georgia Transmission Corp
- Georgia Data Center tax exemption + fiber & gas pipeline ~2.16 mi
- 80 MW Walton Bainbridge power plant ~1.87 miles — SERC/SOCO grid
Executive Summary
The defining feature is on-site 115 KV Georgia Power transmission running directly through the property via Georgia Transmission Corporation, with multiple active segments providing redundant routing options. A 115 KV in-service substation sits adjacent to the Walton Bainbridge node, with a 230/115 KV step-down node in the local Georgia Power network. The 80 MW Walton Bainbridge Power Facility (distillate fuel oil peaker, EIA Plant 56015) is located approximately 1.87 miles from the site. The property sits in the NERC SERC reliability region under Southern Company (SOCO) balancing authority — outside ERCOT and PJM constraints — with direct interconnection studies available through Georgia Power and GTC.
Natural gas optionality is provided by the Southern Natural Gas (SNG) interstate pipeline approximately 2.16 miles from the site. SNG is a Kinder Morgan / Southern Company joint venture and the largest gas transmission operator in Georgia by mileage (1,008 mi of ~6,900-mile interstate system). The pending SSE4 expansion (FERC Docket CP25-517-000) will add 1.3 Bcf/d of capacity via 22 new pipeline loops across 14 segments (~291 miles) in MS/AL/GA.
Fiber and connectivity options include AT&T Fiber (symmetric service up to 5 Gbps), Accelecom regional backbone (enterprise speeds up to 100 Gbps), Mediacom Business, CNSNext, Bainbridge Fiber, Conexon Connect, and Point Broadband — supporting redundant entry and mission-critical uptime profiles.
The site is approximately 40 miles from Tallahassee, FL (TLH commercial airport at 42 mi) and approximately 233 miles to Atlanta via the I-75 corridor. US-27 and US-84 (4-lane regional corridors) intersect at Bainbridge. KBGE Industrial Air Park is approximately 7 miles away, with Port Bainbridge inland barge port on the Flint River nearby.
Hydrology: The property lies in the Lower Flint River sub-basin (HUC 03130008) of the ACF Basin, north of the mapped Flint River SFHA. The Upper Floridan Aquifer (principal SW Georgia source, high-yield wells) is available for cooling, fire protection, and process needs.
Georgia offers a strong incentive environment for data center development, including the High-Tech Data Center sales & use tax exemption (O.C.G.A. § 48-8-3(68.1), in effect through December 31, 2031) covering backup generators, cooling, switchgear, batteries, cabling, and hardware. Decatur County qualifies for the lowest investment threshold tier (population under 30,001): 5 new quality jobs and $25 million in aggregate expenditures over a 7-year period. Local tax abatement potential is available through the Decatur County / Bainbridge Industrial Development Authority. Georgia is a right-to-work state with no franchise tax and offers the Georgia Quick Start workforce program.
Pricing available upon request. All information deemed reliable but not guaranteed. Buyer to verify all information independently.
Offered in association with ParaSell Inc.
Scott Reid
Licensed Georgia Broker
ParaSell, Inc.
GA Broker #77666
Property Facts
| Sale Type | Owner User | Property Subtype | Commercial |
| No. Lots | 1 | Proposed Use | Industrial |
| Property Type | Land | Total Lot Size | 262.00 AC |
| Zoning | Agriculture - Agricultural — outside Bainbridge city limits with flexible zoning & permitting. Buyer to verify with Decatur County Planning. | ||
| Sale Type | Owner User |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Commercial |
| Proposed Use | Industrial |
| Total Lot Size | 262.00 AC |
| Zoning | Agriculture - Agricultural — outside Bainbridge city limits with flexible zoning & permitting. Buyer to verify with Decatur County Planning. |
1 Lot Available
Lot 1
| Lot Size | 262.00 AC |
| Lot Size | 262.00 AC |
262-acre greenfield site on flat upland terrain (~110-130 ft AMSL). 115 KV Georgia Power transmission runs directly through site. Outside city limits with flexible zoning. North of Flint River SFHA — no significant grading challenges anticipated.
Description
262-acre data center and battery storage development site in Bainbridge, Decatur County, Georgia (coordinates 30.8862, -84.52025). The greenfield parcel sits on flat upland terrain at approximately 110-130 ft AMSL, outside city limits with flexible agricultural zoning, offering significant development latitude for energy-intensive end users. The defining feature is on-site 115 KV Georgia Power transmission running directly through the property via Georgia Transmission Corporation, with multiple active segments providing redundant routing options. A 115 KV in-service substation sits adjacent to the Walton Bainbridge node, with a 230/115 KV step-down node in the local Georgia Power network. The 80 MW Walton Bainbridge Power Facility (distillate fuel oil peaker, EIA Plant 56015) is located approximately 1.87 miles from the site. The property sits in the NERC SERC reliability region under Southern Company (SOCO) balancing authority — outside ERCOT and PJM constraints — with direct interconnection studies available through Georgia Power and GTC. Natural gas optionality is provided by the Southern Natural Gas (SNG) interstate pipeline approximately 2.16 miles from the site. SNG is a Kinder Morgan / Southern Company joint venture and the largest gas transmission operator in Georgia by mileage (1,008 mi of ~6,900-mile interstate system). The pending SSE4 expansion (FERC Docket CP25-517-000) will add 1.3 Bcf/d of capacity in MS/AL/GA. Fiber and connectivity options include AT&T Fiber (symmetric service up to 5 Gbps), Accelecom regional backbone (enterprise speeds up to 100 Gbps), Mediacom Business, CNSNext, Bainbridge Fiber, Conexon Connect, and Point Broadband — supporting redundant entry and mission-critical uptime profiles. The site is approximately 40 miles from Tallahassee, FL (TLH commercial airport at 42 mi) and approximately 233 miles to Atlanta via the I-75 corridor. US-27 and US-84 (4-lane regional corridors) intersect at Bainbridge. KBGE Industrial Air Park is approximately 7 miles away, with Port Bainbridge inland barge port on the Flint River nearby. Hydrology: The property lies in the Lower Flint River sub-basin (HUC 03130008) of the ACF Basin, north of the mapped Flint River SFHA. The Upper Floridan Aquifer (principal SW Georgia source, high-yield wells) is available for cooling, fire protection, and process needs. Georgia offers a strong incentive environment for data center development, including the High-Tech Data Center sales & use tax exemption (O.C.G.A. § 48-8-3(68.1), extended to 2031) covering backup generators, cooling, switchgear, batteries, cabling, and hardware. Local tax abatement potential is available through the Decatur County / Bainbridge Industrial Development Authority. Georgia is a right-to-work state with no franchise tax and offers the Georgia Quick Start workforce program. Pricing available upon request. All information deemed reliable but not guaranteed. Buyer to verify all information independently. Offered in association with ParaSell Inc. Scott Reid Licensed Georgia Broker ParaSell, Inc. GA Broker #77666
Property Taxes
| Parcel Number | 0097C-039-000 | Improvements Assessment | $8,618 |
| Land Assessment | $1,400 | Total Assessment | $10,018 |
Property Taxes
Presented by
Carrie Bell Dr - 262 AC | Renewable Energy Development
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.

