Your email has been sent.
Carrer Major 0.03 Acres of Residential Land Offered at $68,303 in Castellfollit de la Roca, Gerona 17856


Some information has been automatically translated.
Investment Highlights
- High buildability.
- All services in the area.
- In a well-established residential area.
- Good public transportation access.
Executive Summary
This is urban land intended mainly for residential use, allowing an approximate buildability of 2.28 m² of floor area per m² of land (m² built/m² land), which offers an interesting potential for the development of a housing project in line with current urban planning regulations.
The plot has all the basic infrastructure necessary for immediate construction, including street lighting, drinking water supply, electrical grid, sewage system, paved roads, and sidewalks, which helps reduce development timeframes and costs.
Property Facts
| Price | $68,303 | Property Type | Land |
| Sale Type | Investment | Property Subtype | Residential |
| No. Lots | 1 | Total Lot Size | 0.03 AC |
| Price | $68,303 |
| Sale Type | Investment |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Residential |
| Total Lot Size | 0.03 AC |
1 Lot Available
Lot
| Price | $68,303 | Lot Size | 0.03 AC |
| Price Per AC | $2,633,007.55 |
| Price | $68,303 |
| Price Per AC | $2,633,007.55 |
| Lot Size | 0.03 AC |
Urban land for sale with an area of 105 m², allowing for an approximate buildability of 2.28 m² per m² of land (m² built/m² land).
Description
Urban land for sale with an area of 105 m2, located in the municipality of Castellfollit de la Roca, in the province of Girona, within a consolidated urban environment. This is urban land primarily for residential use, allowing for an approximate buildability of 2.28 m2 per m² of land (m2t/m2s), offering an interesting potential for developing a housing project in line with current urban planning regulations. The plot has all the basic infrastructure necessary for immediate construction, including public lighting, potable water supply, electrical network, sanitation network, paved roads, and sidewalks, which reduces development time and costs.
Presented by
Carrer Major
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
