Your email has been sent.
88320 Damblain 64,583 SF of Industrial Space Available



Some information has been automatically translated.
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Build-Out
- Available
- Space is in Excellent Condition
- Finished Ceilings: 32’10”
| Space | Size | Term | Rental Rate | Space Use | Build-Out | Available |
| Ground | 64,583 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | Now |
Ground
| Size |
| 64,583 SF |
| Term |
| Negotiable |
| Rental Rate |
| Upon Request Upon Request Upon Request Upon Request |
| Space Use |
| Industrial |
| Build-Out |
| - |
| Available |
| Now |
Ground
| Size | 64,583 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Build-Out | - |
| Available | Now |
- Space is in Excellent Condition
- Finished Ceilings: 32’10”
Property Overview
Turnkey logistics warehouse construction from 6,000 to 18,000 m² Located within the Damblain industrial business park, this real estate program offers 23 hectares of land dedicated to logistics and industrial projects, developed on a turnkey basis by Concerto, a subsidiary of the Kaufman & Broad group. The site will host an initial 18,000 m² logistics project, consisting of three divisible 6,000 m² units, before the development of two additional buildings of 30,000 m² each. The buildings are available for purchase or lease, under VEFA (sale in future state of completion) or BEFA (lease in future state of completion) terms. The projects are designed for operation under ICPE (Installations Classified for Environmental Protection) regulations and aim for a BREEAM Very Good certification. Availability is estimated at 24 months after agreement, subject to obtaining construction and operating permits. Technically, the buildings will offer a clear height of 10 meters, a metal framework, floor loads of 5 tons per square meter, and a charging area of approximately 680 m². The docks are sized with one door per 1,000 m², complemented by a 32-meter linear maneuvering area. Heating is planned to be gas-powered. The park benefits from industrial infrastructure with networks sized to meet the needs of high-intensity activities, with a potable water supply capable of reaching 40 m³ per hour, the presence of industrial water, fire protection ensured by a 700 m³ reserve, and sanitation connected to a collection network. The site also has fiber optic connectivity at the zone entrance. The electrical supply plans for a power of 6 MW available by 2025, with an extension planned up to 16 MW, while gas is available at the zone entrance and can be deployed according to the specific needs of each project. ICPE A: 1510-2 - 4331 - 2910-A - 2925-1 - 2925-2 - 4755 - 4110 - 4120 - 4130 - 4140 - 4150 - 4321 - 4440 - 4441 - 4442 - 4510 - 4511 - 4320
Presented by
"88320 Damblain"
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.

