Your email has been sent.
Highlights
- Land is lasered, and all the pieces are in place for large-scale technology, AI, and data center development to begin in Q1 2026.
- Impeccable positioning atop the Alpine High Gas zone, a 5,000-foot thick natural gas zone, ranked by Britannica as a global Supergiant field.
- Gas transport company will sign a contract for 10+ years, with firm transport, and the gas capacity will be ready after the six-month meter built out.
- Averaging $2.00 or less per MMBTU (= under $0.02 per kWh), WAHA index gas is among the cheapest in the United States.
- Emissions are covered with SCR systems in place to reduce NOx to under 9 PPM, qualifying for Texas's expedited TCEQ permitting (60 to 90 days).
- Area is poised to become a global energy capital and is expected to be one of the largest energy sectors in the world within the next five years.
LOT Available
Display Rental Rate as
| Rental Rate |
|
Lot Size | 770.00 AC |
| Lease Term | Negotiable |
| Rental Rate | |
| Lease Term | Negotiable |
| Lot Size | 770.00 AC |
The development of 240 megawatts of gas-fired power generation is underway on a 770-acre parcel, with completion scheduled for Q1 to Q2 of 2027. Credible off-takers and tenants are being sought for this project. This development is the first of multiple phases planned over the next seven years, which will steadily transform the site into one of the largest energy campuses in West Texas, with a total capacity of 2.4 gigawatts.
The site is located just 19 minutes from Microsoft/Nscale’s $14 billion artificial intelligence (AI) data center in Barstow, Texas, which is the largest deal to date in the state. The property features two commercial wells producing 3,000 gallons per minute of water, cleared and lasered land ready for development, dark fiber connectivity, and a location outside city limits. A Phase 1 ESA report has been completed and is clean. A wetlands study will be available shortly, and no issues are anticipated. A mineral rights surface use agreement has been secured, confirming that the mineral rights owner and lease operator will not interfere with development plans.
Off-takers are sought for all or part of the initial 240-megawatt phase. Lease pricing is negotiable and aligned with market rates. Serious inquiries only. A 6% commission will be paid to the buyer’s broker.
Property Overview
The site is located just 19 minutes from Microsoft/Nscale’s $14 billion artificial intelligence (AI) data center in Barstow, Texas, which is the largest deal to date in the state. The property features two commercial wells producing 3,000 gallons per minute of water, cleared and lasered land ready for development, dark fiber connectivity, and a location outside city limits. A Phase 1 ESA report has been completed and is clean. A wetlands study will be available shortly, and no issues are anticipated. A mineral rights surface use agreement has been secured, confirming that the mineral rights owner and lease operator will not interfere with development plans.
Property Facts
Demographics
Regional Accessibility
Nearby Amenities
Restaurants |
|||
|---|---|---|---|
| Subway | - | - | 8 min walk |
| Domino’s | - | - | 12 min walk |
Retail |
||
|---|---|---|
| Tractor Supply Company | Home Improvement | 7 min walk |
Hotels |
|
|---|---|
| Hampton by Hilton |
64 rooms
2 min drive
|
| Red Roof Inn |
36 rooms
2 min drive
|
| Best Western Plus |
105 rooms
3 min drive
|
| Comfort Suites |
58 rooms
4 min drive
|
| Fairfield Inn |
87 rooms
4 min drive
|
Leasing Agent
Richard Lowrance, Seller Representative
Presented by
Highway 17
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.




