Log In/Sign Up
Your email has been sent.
57500 Saint-Avold Land Building Offered For Sale
Some information has been automatically translated.
SALE NOTES
Turnkey site from the France Relance plan: Chemesis Platform for industrial and logistics activities.
ECOSYSTEM:
Education/Research:
- A university hub (50,000 students, 3,700 teachers, €544 million budget) bringing together 14 major engineering schools (chemistry, materials, technology, electricity...).
- 20 specialized initial training programs in industrial trades: 12 BTS, 8 DUT. 28 qualifying training sites for workers and operators, business-oriented.
- The Technological Research Institute for Materials, Metallurgy, and Processes (IRT M2P).
- The Eastern Plastics Center based in Carling (PPE). An international technical center specializing in the implementation of filled polymers and long or continuous fiber composites with thermoplastic or thermosetting matrices, as well as in assembly technologies.
- Three competitiveness and skills clusters: Materalia, Fibres, and Hydreos clusters.
Potential Partners:
AFYREN NEOXY, Air Liquide France Industrie, ALTUGLAS INTERNATIONAL, ARKEMA, Cokes de Carling, GazelEnergie Generation, METEX NØØVISTA, Eastern Plastics Center (PPE), PROTELOR, SNF SA, SNF Coagulants, TOTAL PETROCHEMICALS France, France Chimie Grand Est, QUARON, Total Direct Energie, and Total Solar ESS Carling.
Public Assistance:
Several mechanisms have been identified:
- Assistance to support the transition of coal sites, including the GazelEnergie site: the Just Transition Fund (FTJ), the Warndt Naborien Territory Project aimed at supporting the closure of the coal unit.
- Additional local, regional, and national common law assistance available depending on candidate applications (ADEME, France Relance, Industry Territory, for example).
TIMELINES:
- BUILDING PERMIT: Less than 3 months
- ENVIRONMENTAL AUTHORIZATIONS: Between 9 and 10 months
- STUDIES ALREADY CONDUCTED: 4-season inventory (ongoing), preventive archaeology
SERVICES:
Electricity:
- High Voltage (63 kV and above)
- Medium Voltage (20 kV)
- Direct connection to the RTE network possible
Gas:
- 2 gas networks available on site: one at 15 bars, the other at 2.5 bars.
- A connection to a 60-bar network is underway
Sanitation: Collective
Digital: Very high-speed internet access
Catering: Yes
Areas: 8.00 hectares turnkey, including 3 hectares in a single block.
Price: Please contact us for more information on this opportunity.
What is a turnkey industrial site?
The plan is part of the "France Relance" initiative, which includes measures to support the economy and financial incentives.
Sites immediately available for industrial and logistics purposes.
Anticipated procedures to accelerate industrial setups (urban planning, preventive archaeology, and environment).
Attractive sites: accessibility, available networks, services offered to businesses and employees, local ecosystems.
ECOSYSTEM:
Education/Research:
- A university hub (50,000 students, 3,700 teachers, €544 million budget) bringing together 14 major engineering schools (chemistry, materials, technology, electricity...).
- 20 specialized initial training programs in industrial trades: 12 BTS, 8 DUT. 28 qualifying training sites for workers and operators, business-oriented.
- The Technological Research Institute for Materials, Metallurgy, and Processes (IRT M2P).
- The Eastern Plastics Center based in Carling (PPE). An international technical center specializing in the implementation of filled polymers and long or continuous fiber composites with thermoplastic or thermosetting matrices, as well as in assembly technologies.
- Three competitiveness and skills clusters: Materalia, Fibres, and Hydreos clusters.
Potential Partners:
AFYREN NEOXY, Air Liquide France Industrie, ALTUGLAS INTERNATIONAL, ARKEMA, Cokes de Carling, GazelEnergie Generation, METEX NØØVISTA, Eastern Plastics Center (PPE), PROTELOR, SNF SA, SNF Coagulants, TOTAL PETROCHEMICALS France, France Chimie Grand Est, QUARON, Total Direct Energie, and Total Solar ESS Carling.
Public Assistance:
Several mechanisms have been identified:
- Assistance to support the transition of coal sites, including the GazelEnergie site: the Just Transition Fund (FTJ), the Warndt Naborien Territory Project aimed at supporting the closure of the coal unit.
- Additional local, regional, and national common law assistance available depending on candidate applications (ADEME, France Relance, Industry Territory, for example).
TIMELINES:
- BUILDING PERMIT: Less than 3 months
- ENVIRONMENTAL AUTHORIZATIONS: Between 9 and 10 months
- STUDIES ALREADY CONDUCTED: 4-season inventory (ongoing), preventive archaeology
SERVICES:
Electricity:
- High Voltage (63 kV and above)
- Medium Voltage (20 kV)
- Direct connection to the RTE network possible
Gas:
- 2 gas networks available on site: one at 15 bars, the other at 2.5 bars.
- A connection to a 60-bar network is underway
Sanitation: Collective
Digital: Very high-speed internet access
Catering: Yes
Areas: 8.00 hectares turnkey, including 3 hectares in a single block.
Price: Please contact us for more information on this opportunity.
What is a turnkey industrial site?
The plan is part of the "France Relance" initiative, which includes measures to support the economy and financial incentives.
Sites immediately available for industrial and logistics purposes.
Anticipated procedures to accelerate industrial setups (urban planning, preventive archaeology, and environment).
Attractive sites: accessibility, available networks, services offered to businesses and employees, local ecosystems.
PROPERTY FACTS
| Sale Type | Owner User | Property Type | Land |
| Sale Type | Owner User |
| Property Type | Land |
1 1
1 of 2
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
1 of 1
Presented by
Pôle Implantation Entreprises
"57500 Saint-Avold"
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.