Your email has been sent.
EQT SouthPort Logistics Park Southport Rd 1,026,000 - 2,052,000 SF of 4-Star Industrial Space Available in Wilmer, TX 75172


Highlights
- Dedicated elevated water tower for FM fire rating
- 25.6 AC of additional land for trailer or car parking
- Institutional quality infrastructure with best in class technology
- No onsite detention or retention basins required
- Clear heights: 40’
- Cost effective drayage
Features
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Build-Out
- Available
Building 3: Construction commencing on August 2026, with anticipated completion Q3 2027. Building 4: Build-to-suit opportunities available. Building 3 Specs: • 40’ clear height • 8" reinforced concrete slab with full vapor barrier • Upgraded R-20 roof insulation with 60mil TPO • 4,000 amp electrical service (expandable) with 2 - 1,000 amp distribution panels • 175 (9’ x 10’) dock doors • 4 (14’ x 16’) drive-in doors • 491 car parking spaces • 311 trailer storage spaces, expandable to 451 • 65’ speed bays • 60’ x 55’ column spacing • ESFR sprinkler system • 30 FC LED high bay lighting - 4 lights per bay • 3,900 SF spec office pod • 103 - 50k lbs. capacity hydraulic pit levelers • Triple Freeport
- 4 Drive Ins
- 350 Loading Docks
- Space is in Excellent Condition
| Space | Size | Term | Rental Rate | Space Use | Build-Out | Available |
| 1st Floor | 1,026,000-2,052,000 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | Partial Build-Out | September 01, 2027 |
1st Floor
| Size |
| 1,026,000-2,052,000 SF |
| Term |
| Negotiable |
| Rental Rate |
| Upon Request Upon Request Upon Request Upon Request |
| Space Use |
| Industrial |
| Build-Out |
| Partial Build-Out |
| Available |
| September 01, 2027 |
1st Floor
| Size | 1,026,000-2,052,000 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Build-Out | Partial Build-Out |
| Available | September 01, 2027 |
Building 3: Construction commencing on August 2026, with anticipated completion Q3 2027. Building 4: Build-to-suit opportunities available. Building 3 Specs: • 40’ clear height • 8" reinforced concrete slab with full vapor barrier • Upgraded R-20 roof insulation with 60mil TPO • 4,000 amp electrical service (expandable) with 2 - 1,000 amp distribution panels • 175 (9’ x 10’) dock doors • 4 (14’ x 16’) drive-in doors • 491 car parking spaces • 311 trailer storage spaces, expandable to 451 • 65’ speed bays • 60’ x 55’ column spacing • ESFR sprinkler system • 30 FC LED high bay lighting - 4 lights per bay • 3,900 SF spec office pod • 103 - 50k lbs. capacity hydraulic pit levelers • Triple Freeport
- 4 Drive Ins
- Space is in Excellent Condition
- 350 Loading Docks
Property Overview
EQT SouthPort Logistics Park is a part of master-planned, state of the art industrial park located in the South Dallas submarket directly across Interstate 45 from the Union Pacific Intermodal Yard. EQT will begin construction on Building 3 on a speculative basis in August 2026, with expected substantial completion late Q3 2027. Building 4 is available for build-to-suit opportunities.
Distribution Facility Facts
Contact the Leasing Agent
EQT SouthPort Logistics Park | Southport Rd
