Near the A13 highway, a logistics site of 10,690 m² with 12 dock levelers, multiple ICPE certifications, partially renovated in 2024.
Located on a 30,565 m² plot, this logistics site includes:
- Metal structure
- Insulated steel roof (completely redone in 2020)
- Double-skin cladding (external insulation on the façade and left side in 2024 + façade renovation)
- Concrete slab (complete overhaul and reinforcement with 1,200 inclusions between 9m and 12m in 2024)
- 2 interconnected units of 4,800 m² each
- ICPE certifications:
- 1510: 82,000 m³ with a maximum of 13,000 pallets
- 1530 / 1532 / 2662 / 2663: 48,000 m³
- 1432: 85 m³ (increase to 99 m³ in progress)
- 2925: 34KW (8 to 10 charging stations)
- Charging room
- New 22KW charging station
- 12 dock levelers at the front
- 1 ground-level access door at the rear
- 1 continuous dock at the rear of the building
- LED relamping connected in compliance with BACS decree (2024)
- Electric air heaters
- Social facilities (changing rooms and restrooms) on the ground floor
- 1,000 m² of mezzanine office space with an entrance through glass atriums, featuring a cafeteria, meeting room, partitioned office spaces, and male/female restrooms
- Electric heating and air conditioning
- Sprinkler room
- Fire access road
- Retention basin
Secure access with electric gates and barriers
Site security includes cameras, infrared beams, and access badges. Fully fenced.
Parking for light vehicles: 30 spaces with 1 22KW charging station
Parking for heavy vehicles
Close to A13 highway connecting Paris and Le Havre
Independent building
Ground floor area: 9,820 m²
Maximum free height under beam: 8.5 m
Floor load capacity: 4 T/m²
Location/Transportation:
SNCF train station 5 km away
A13 highway 6 km away