Log In/Sign Up
Your email has been sent.
Highlights
- ±6,480 SF Building on ±19,650 SF of Land
- Divisible to Two (2) Clearspan Units, Separately Metered
- 300 Amps, 240 Volts, 3-Phase Electrical (verify)
- Upgrades: LED Lights, Tex Cote Roof Paint, Interior Finishes, Electrical Upgrades
- Drive Through and Drive Around Access
- Four (4) Oversized Grade Level Doors (12’ x 14’)
Features
Clear Height
14’
Drive In Bays
4
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Build-Out
- Available
Minimum 14’ Clear Height / Clearspan Upgrades: LED Lights, Tex Cote Roof Paint, Interior Finishes, Electrical Upgrades Four (4) Restrooms Four (4) Oversized Grade Level Doors (12’ x 14’) 400 Amps, 240 Volts, 3-Phase Electrical (verify) Fenced and Paved Yard with Outdoor Lighting Drive Through and Drive Around Access
- Listed rate may not include certain utilities, building services and property expenses
| Space | Size | Term | Rental Rate | Space Use | Build-Out | Available |
| 1st Floor | 6,480 SF | Negotiable | $15.48 /SF/YR $1.29 /SF/MO $100,310 /YR $8,359 /MO | Industrial | - | Now |
1st Floor
| Size |
| 6,480 SF |
| Term |
| Negotiable |
| Rental Rate |
| $15.48 /SF/YR $1.29 /SF/MO $100,310 /YR $8,359 /MO |
| Space Use |
| Industrial |
| Build-Out |
| - |
| Available |
| Now |
1st Floor
| Size | 6,480 SF |
| Term | Negotiable |
| Rental Rate | $15.48 /SF/YR |
| Space Use | Industrial |
| Build-Out | - |
| Available | Now |
Minimum 14’ Clear Height / Clearspan Upgrades: LED Lights, Tex Cote Roof Paint, Interior Finishes, Electrical Upgrades Four (4) Restrooms Four (4) Oversized Grade Level Doors (12’ x 14’) 400 Amps, 240 Volts, 3-Phase Electrical (verify) Fenced and Paved Yard with Outdoor Lighting Drive Through and Drive Around Access
- Listed rate may not include certain utilities, building services and property expenses
Manufacturing Facility Facts
Building Size
6,480 SF
Lot Size
0.45 AC
Year Built/Renovated
1953/2025
Construction
Metal
Power Supply
Amps: 400 Volts: 120-240 Phase: 3 Wire: 4
Zoning
CDR2 - Corridor 2
1 1
Moderately walkable
60/100
Exceptionally drivable
90/100
Some public transit
40/100
Moderately bikeable
70/100
1 of 4
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1



