Log In/Sign Up
Your email has been sent.
Investment Highlights
- Land in Front of Building 1 is Stabilized (4” - 5” Crushed Stone)
- City Water Available to Site
- Occupiable November 2026
Executive Summary
Occupiable November 2026
Land in Front of Building 1 is Stabilized (4” - 5” Crushed Stone)
Building 1 - ± 2,400 SF
- Two (2) 14’ x 14’ Doors
Building 2 - ± 3,900 SF
- Two (2) 9’ x 9’ Doors
- One (1) 14’ x 14’ Door
- Two (2) Restrooms
- Three (3) Offices
Building 3 - ± 2,070 SF
Well & Septic
- City Water Available to Site
Land in Front of Building 1 is Stabilized (4” - 5” Crushed Stone)
Building 1 - ± 2,400 SF
- Two (2) 14’ x 14’ Doors
Building 2 - ± 3,900 SF
- Two (2) 9’ x 9’ Doors
- One (1) 14’ x 14’ Door
- Two (2) Restrooms
- Three (3) Offices
Building 3 - ± 2,070 SF
Well & Septic
- City Water Available to Site
Property Facts
1 1
Fairly walkable
40/100
Exceptionally drivable
100/100
Fairly bikeable
50/100
1 of 4
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1



