Your email has been sent.
2524 N McCall Ave - 39.9 Acres with 30 acres of Almonds 39.9 Acres of Agricultural Land Offered at $1,650,000 in Sanger, CA 93657

Executive Summary
Groundwater Disclosure
Sustainable Groundwater Management Act (SGMA) requires groundwater basins to be sustainable by 2040. SGMA requires a Groundwater Sustainability Plan (GSP) by 2020. Said plans may limit ground water pumping. For more information please visit the SGMA website
The Buyer is responsible for conducting their own research to verify all information related to groundwater and surface water resources, including availability, usage rights, and potential restrictions.
Property Facts
| Price | $1,650,000 | Property Subtype | Agricultural |
| Sale Type | Investment | Proposed Use | Agricultural |
| No. Lots | 1 | Total Lot Size | 39.90 AC |
| Property Type | Land |
| Price | $1,650,000 |
| Sale Type | Investment |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Agricultural |
| Proposed Use | Agricultural |
| Total Lot Size | 39.90 AC |
1 Lot Available
Lot
| Price | $1,650,000 | Lot Size | 39.90 AC |
| Price Per AC | $41,353.38 |
| Price | $1,650,000 |
| Price Per AC | $41,353.38 |
| Lot Size | 39.90 AC |
FID,FID,FID, these are 39.9 acres of total land, approximately . There are two wells and receiving FID water too, ditch water is set up through drip system, there is p
Description
FID,FID,FID, these are 39.9 acres of total land, approximately 30 acres are planted to 12 year old Almonds which are 50% Nonpareil and 50% Aldrich. There are two wells and receiving FID water too, ditch water is set up through drip system, there is plenty of water. There are lots of custom homes built in the neighborhood and development is coming in that way. New homes are being built on Ashlan Ave close to McCall Ave. This will be a good investment property, income coming in until some development comes to that area. Farm is located in good area, easy commute to Clovis, Fresno and Sanger. Groundwater Disclosure Sustainable Groundwater Management Act (SGMA) requires groundwater basins to be sustainable by 2040. SGMA requires a Groundwater Sustainability Plan (GSP) by 2020. Said plans may limit ground water pumping. For more information please visit the SGMA website The Buyer is responsible for conducting their own research to verify all information related to groundwater and surface water resources, including availability, usage rights, and potential restrictions.
Presented by
2524 N McCall Ave - 39.9 Acres with 30 acres of Almonds
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
